Government

Trouble at the Tracks: MRT 3 Unloads Passengers due to Technical Glitch

Google+ Pinterest LinkedIn Tumblr

A supposed “technical glitch” of the Metro Rail Transit 3 resulted to a forced unloading of passengers in Cubao Station.

In a tweet by the management of the MRT line 3, a technical problem caused the unloading of hundreds of passengers at 9 A.M. March 1, 2017.

The train operations were restored after 30 minutes.

Write A Comment